Iterative Design

Mission Library


Design Cycle 1

Design Cycle 2

Design Cycle 3

 

 

"Round trip data tracking is tough, but really cool"
- User 13

"The only thing people normally care about are what site it was taken in, what time of day, how long did it run, what resources did it use, and what filters were used"
- User 20

"the mission library could be really useful"
- User 28

"can I copy from the mission library? I would right click it", "it would be really nice to have that"
- User 25

"I like having the plan linked directly to the data product, because that is always a pain to try to figure out"
- User 19